
← the floorCharcoal Planter Build Plan/build order·if / 076
Line it
DPM up the walls, weed membrane over the floor.
The card
build order 09 of 11Line it
build order 09 of 11idea_076
The notes
renderedStaple DPM to the inside walls, from 10mm below the top down to the floor, and turn it 50mm onto the floor. Fold the corners rather than cutting them. Where a rod comes through, cut a small cross in the DPM, push it over the rod and seal it with exterior sealant. Lay weed membrane over the floor, lapping it onto the DPM.