Fit the tie rods
Two M10 stainless rods through the mid posts at 400mm, nuts let into counterbores.
The card
build order 04 of 11Fit the tie rods
build order 04 of 11idea_076
The notes
renderedAt each mid post, drill a 12mm hole straight through both sides at 400mm high. Counterbore the outside faces with a 25mm bit, 12mm deep, so the nut sits below the surface. Fit the rod with a penny washer and nut at each end, and tighten until it’s snug.